Installation & Commissioning
Fully integrated installation and startup support, including DCS/SCADA interfacing

Seamless System Deployment
Successful CEMS deployment requires more than just hardware installation—it demands expertise in mechanical systems, electrical integration, process understanding, and rigorous quality control. Our installation and commissioning services ensure your monitoring system is fully operational, accurate, and compliant from day one.
We handle the complete installation lifecycle, from pre-installation planning through final performance verification, with minimal disruption to your facility operations. Our experienced technicians work closely with your team to ensure seamless integration with existing control systems and data infrastructure.
End-to-End Deployment Support
From mechanical installation to system integration and operator training.
System Installation
Professional installation of all CEMS components with minimal disruption to operations.
- Equipment mounting
- Sampling system setup
- Analyzer installation
- Shelter preparation
Integration Services
Seamless connection to your existing control systems and data infrastructure.
- DCS integration
- SCADA interfacing
- Data historians
- Network configuration
Performance Verification
Comprehensive testing to validate system accuracy and regulatory compliance.
- Relative accuracy tests
- Linearity checks
- Calibration verification
- Drift assessments
Documentation & Training
Complete documentation package and hands-on operator training programs.
- Operations manuals
- Maintenance procedures
- Operator training
- Troubleshooting guides
Commissioning Phases
Structured approach ensuring quality and minimal operational disruption.
Pre-Installation
1-2 weeks
- Site readiness verification
- Equipment staging
- Utility confirmation
- Safety planning
- Team mobilization
Installation
2-5 days
- Equipment mounting
- Piping and wiring
- Power connections
- Sampling system installation
- Safety system integration
Commissioning
3-7 days
- System startup
- Calibration and testing
- DCS/SCADA integration
- Performance verification
- Documentation completion
Training & Handover
2-3 days
- Operator training
- Maintenance procedures
- Troubleshooting sessions
- Documentation transfer
- Project closeout
Seamless Control System Integration
We connect your CEMS to existing infrastructure using industry-standard protocols.
DCS Integration
Direct connection to distributed control systems for real-time process control.
Supported Protocols:
SCADA Systems
Integration with supervisory control and data acquisition platforms.
Supported Protocols:
Data Historians
Connection to historical data storage and analytics platforms.
Supported Protocols:
Ready to Deploy Your CEMS?
Let our experienced team handle your installation and commissioning for a smooth, successful deployment.